The preliminary plan would:
-
Enhance building safety and security.
-
Address Americans with Disabilities Act (ADA) compliance issues.
-
Update exterior building sections and replace windows, flooring, and doors (as needed).
-
Upgrade plumbing, electrical, fire alarm, and bell systems.
-
Address other needs identified in the 2020 Facility Study.
In addition, the plan would: (see above)
-
Build a single-story classroom addition on the east side of the building providing space for sixth-grade students (who are currently at the elementary school). This will address elementary school capacity issues and allow these students to participate in higher-level learning opportunities.
-
Build a two-story addition on the north side of the building with classrooms, science labs, and areas to support hands-on collaborative learning.
-
Renovate and modernize all existing classrooms (including tech. ed., art, family and consumer science, computer programming, and business education) and support areas (including the gyms, locker rooms, and stage).
-
Build a dedicated music addition with better acoustics and instrument storage.
-
Build a library media center with small group collaborative learning spaces.
-
Build a cafeteria and kitchen to improve serving efficiencies and seating capacity.
-
Add a new courtyard to introduce natural light into the center of the building.
-
Build a maintenance shop.
-
Relocate parking.
|
|
|